Package Checklist; Preparation; Installing The Power Supply And Cord - Zhone iMarc SLV 9126 Installation Instructions Manual

Table of Contents

Advertisement

Package Checklist

Verify that your package contains the following:
iMarc SLV unit
Power cord with desktop 120 VAC power transformer.
T1 network cable
ISDN BRI cable, if applicable

Preparation

Make sure you have:
A dedicated, grounded power outlet that is protected by a circuit breaker within 6 feet of the
iMarc SLV (service level verifier) unit.
A clean, well lit, and well ventilated site that is free from environmental extremes.
One to two feet of clearance for cable connections.
An asynchronous terminal or PC (personal computer).
If required, an Ethernet LAN connection for access by an NMS.
Configuration information for the iMarc unit being installed or replaced.
Appropriate cables as required:
— DSX cable
— Data port cable
— COM port-to-terminal or COM port-to-PC cable
— Modem cable
— Ethernet cable
A T1 line interface cable for use in Canada (RJ48C-to-CA81A) is available from Zhone. Contact
your sales representative to order feature number PDN-3100-F1-510.
See the appropriate manual for additional information:
Troubleshooting: see the iMarc SLV Operations Guide
Technical Specifications, Connectors, Cables, and Pin Assignments: see the iMarc
Technical Description

Installing the Power Supply and Cord

Read the
Important Safety Instructions
9126-A2-ZN11-40
on page 31 before you install the unit.
5

Advertisement

Table of Contents
loading

Table of Contents