Server Installation Process

This section contains a list of tasks that you must complete during the installation
process. Each task includes a reference to the appropriate instructions. Each task
must be completed in order.
1. Preparing the site according to the power, clearance, and environmental
requirements.
If you are installing the server into a new Sun™ rack, you must fully prepare the
site for the installation. If you are installing the server into an existing rack, you
must conduct some site preparation to satisfy the additional power and
environmental requirements. See
instructions.
2. Verifying that you have received all of the components.
The Sun Fire server ships in several packages. See
page 7
3. Installing the server into the rack.
The installation of the rack slides and cable management arm (CMA) represent
the majority of physical work during the installation. This release of the Sun Fire
servers includes new rack slides, so the slide installation differs greatly from prior
2
Sun Fire V210 and V240 Servers Getting Started Guide • November 2005
Server Differentiating Features (Continued)
Sun Fire V210
1
2
1
for a list of the shipping kit.
Sun Fire V240
3
4
2 (redundant)
"Site Preparation" on page 4
"Shipping Kit Contents" on
for specific