Server Installation Process

This section contains a list of tasks that you must complete during the installation
process. Each task includes a reference to the appropriate instructions. Each task
must be completed in order.
1. Preparing the site according to the power, clearance, and environmental
requirements.
If you are installing the server into a new Sun™ rack, you must fully prepare the
site for the installation. If you are installing the server into an existing rack, you
must conduct some site preparation to satisfy the additional power and
environmental requirements. See
instructions.
2. Downloading the appropriate documentation.
You will need to download the Sun Fire V215 and V245 Servers Installation Guide
and the Sun Fire V215 and V245 Servers Product Notes before you attempt to install
the server. You can obtain these documents and other guides associated with
these servers at:
http://www.sun.com/documentation
3. Verifying that you have received all of the components.
The Sun Fire server ships in several packages. See
page 8
for a list of the shipping kit.
4. Installing the server into the rack.
The installation of the rack slides and cable management arm (CMA) represent
the majority of physical work during the installation.
5. Setting up a console to communicate with the server.
To set up the console, refer to the Sun Fire V215 and V245 Servers Installation Guide
for instructions.
"Site Preparation" on page 4
"Shipping Kit Contents" on
Introducing the Sun Fire V215 and V245 Servers
for specific
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun fire v245

Table of Contents