Servicing Schedule; Instructions For Inspection And Servicing - Lattner Boiler Company Alkon 90 Installation And Servicing Manual

Alkon 90 condensing gas boiler
Table of Contents

Advertisement

4
INSPECTION AND SERVICING SCHEDULE
CAUTION
To ensure the continued safe and efficient
operation of the boiler it is highly
recommended that it is checked at regular
intervals and serviced when necessary, and
that only original spare parts are used.
Regular attention will prolong the life of the
boiler.
DANGER
If the boiler is not checked and serviced
regularly it could cause material and personal
damages.
For this reason LATTNER recommends that a ser vicing
contract should be made with our authorized After Sales
Service Assistance Centre.
The boiler must have regular maintenance and cleaning in
order to ensure reliable and efficient operation. Regular
attention will prolong the life of the boiler.
The frequency of servicing will be determined by the service
engineer and will depend on the appliance's state of condition.
TABLE OF THE RESISTANCE VALUES IN FUNCTION OF THE HEATING SENSOR (SR) AND RETURN HEATING SENSOR
TEMPERATURE (SRR)
T° F (C)
32 (0)
32 (0)
32755
50 (10)
20003
68 (20)
12571
86 (30)
8112
104 (40)
5363
122 (50)
3627
140 (60)
2504
152 (70)
1762
176 (80)
1263
194 (90)
920
Relation between the temperature (°C) and the nom.
resistance (Ohm) of the heating sensor SR and the return
heating sensor SRR.
33.8 (1)
35.6 (2)
37.2 (3)
31137
29607
28161
19072
18189
17351
12019
11493
10994
7775
7454
7147
5152
4951
4758
3491
3362
3238
2415
2330
2249
1703
1646
1592
1222
1183
1146
892
865
INSTRUCTIONS FOR INSPECTION AND
SERVICING
Before servicing always carry out the following steps:
-
Disconnect the mains electricity supply.
-
Separate the appliance from the electrical supply by me-
ans of a separating device with an opening contact of at
least 3 mm (for example safety devices or power switches)
and ensure yourself that it cannot be accidentally reinser-
ted.
-
Close the on-off valve fitted upstream of the boiler.
-
If necessary, and in function of the type of work to be car-
ried out, close any on-off valves fitted on the CH flow and
return pipes, as well as the cold water inlet valve.
-
Remove the appliance's front panel.
After having carried out all the necessary maintenance work
always follow these steps:
-
Open the CH flow and return valves as well as the cold
inlet valve (if previously closed),
-
Purge and, if necessary, proceed with restoring the hea-
ting system's pressure until a pressure of 0,8/1 bar is rea-
ched.
-
Open the on-off gas cock.
-
Reconnect the appliance to the electrical supply and switch
on the mains electrical supply.
-
Test for gas soundness, on the gas side and on the water
side.
-
Replace the appliance's front panel.
39.2 (4)
41 (5)
26795
25502
16557
15803
10519
10067
6855
6577
4574
4398
3119
3006
2171
2096
1539
1488
1110
1075
839
814
790
Ex:
At 101 °F (25°C), the nominal resistance is 10067 Ohm
At 194 °F (90°C), the nominal resistance is 920 Ohm

Servicing schedule

CAUTION
To ensure a long life to all your boiler
components and in order not to alter the
conditions of the approved product, only
original LATTNER spare parts must be used.
IMPORTANT:
After having performed the maintenance of
the appliance remember to reset the counter
by selecting "Cr" from the parameters menù
and introducing the relevant resetting code.
42.8 (6)
44.6 (7)
24278
23121
15088
14410
9636
9227
6311
6057
4230
4069
2897
2792
2023
1954
1440
1393
1042
1010
766
744
46.4 (8)
48.2 (9)
22025
20987
13765
13153
8837
8466
5815
5584
3915
3768
2692
2596
1888
1824
1348
1304
979
949
722
701
41

Advertisement

Table of Contents
loading

Table of Contents