INITIAL LIGHTING

PRELIMIARY CHECKS
CAUTION
The first ignition must be carried out by a
qualified technician. Failure to do so could
cause injury to persons, animals or damage
to property. LATTNER shall not be held liable
for any injury and/or damage.
Before lighting the boiler check that:
-
the boiler installation has been carried out in accordance
with the specific Standards and regulations in force for
the gas part and for the electrical part;
-
the air supply and the discharge of the products of
combustion are carried out in the correct way in
accordance to the specific Standards and regulations in
force;
-
the gas supply system is correctly dimensioned for the
boiler's output and is fitted with all the safety and control
devices prescribed by the regulations in force;
-
the electrical supply must be 120 V - 60 Hz;
-
the system has been filled with water (pressure
registered on the gauge 11,6/14,5 psi (0,8/1) bar with
pump not running);
-
any on-off valves of the system are open;
-
the mains supply gas corresponds to the one which the
boiler has been calibrated for: otherwise convert the boiler
to use the available gas (Using kit code and follow the
instruction "GAS CONVERSION"); this operation must be
carried out by a qualified technician in compliance to the
regulations in force;
-
the gas supply cock is open;
-
there are no gas leaks;
-
the external mains supply switch is on;
-
the system's safety valve on the boiler is not blocked and
that it is connected to the sewage system;
-
the condensate drain siphon has been filled with water;
Instructions for the installer
DANGER!
Before commissioning the appliance fill the
siphon and check the correct drainage of the
condensate.
If the appliance is used with the condensate
drain siphon empty there could be danger of
intoxication resulting from the escape of flue
gasses.
-
there are no water leaks;
-
all the necessary ventilation conditions and minimum
clearance distances are guaranteed for subsequent
servicing.
LIGHTING AND SHUTTING DOWN PROCEDURES
For lighting and shutting down the boiler refer to the
"INSTRUCTIONS GUIDE FOR THE PERSON IN CHARGE OF
THE APPLIANCE"
Information to be passed on to the user.
The usert be instructed on the use and operation of the
boiler and in particular:
-
Hand the booklet: "USER'S OPERATING
INSTRUCTIONS", as well as all the other literature
relative to the appliance, and placed in the envelope
contained in the packaging, to the user.
The user must retain this literature for any future
reference.
-
Inform the user of the importance of the air vents and of
the flue outlet system, stressing the fact that absolutely
no modification can be made.
-
Inform theuser regarding the control of the system water
pressure and how to restore it to the correct value.
-
Explain and demonstrate to the user the correct function
and adjustment of the temperature, thermostats and
radiators for the economic use of the system.
-
Remind the user that a comprehensive service and the
measurement of the combustion efficiency should be
carried out regularly (as requested by the national law).
-
If the appliance is sold or transferred to another owner
or if the present user moves home and leaves the
appliance installed, ensure yourself that the manual
always follows the appliance so that it can be consulted
by the new owner and/or installer.