Lattner Boiler Company SPACE SAVER Operating Instructions Manual

Lattner Boiler Company SPACE SAVER Operating Instructions Manual

Electric

Advertisement

INSTALLATION,
MAINTENANCE, AND
SERVICE INSTRUCTION
MANUAL
INDEX
Application
UL Listed under File No. E30432 to 600 volts and
120 KW as primary heat source, secondary heat
source, or as standby heat source for solar,
hydronic, and water source heat pump systems.
Vessel
ASME Code, Section IV "H" stamped, National
Board registered, rated to 160 psig and 250
degrees Fahrenheit.
Insulation
4" fiberglass blanket on vessel.

GENERAL INFORMATION

Elements
Incoloy sheathed, 75 watts per inch, mounted in
150
pound
removable.
Enclosure
Ventilated integral control panel constructed of
heavy gauge steel contains line terminals, fuses,
contactor(s), temperature controller, and safety
high limit devices. All surfaces are phosphatized
and protected against corrosion with factory
applied finish.
1
SPACE SAVER
ELECTRIC HOT WATER
BOILERS
ASA
steel
flange,
individually

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPACE SAVER and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Lattner Boiler Company SPACE SAVER

  • Page 1 INSTALLATION, SPACE SAVER MAINTENANCE, AND ELECTRIC HOT WATER SERVICE INSTRUCTION BOILERS MANUAL General Information …………………………….Page 1 Installation ………………………...……………..Page 2 Start Up …………………………………………..Page 3 INDEX Maintenance ……………………….……………..Page 3 Control ……………………………………………..Page 4 Service Instructions …………………………….Page 5 Limited Warranty ………………………………Page 6 GENERAL INFORMATION Application UL Listed under File No.
  • Page 2 INSTALLATION 5. Connect supply return piping 1. Install drain valve furnished with boiler. according to applicable codes. Pipe relief 2. Set boiler in position to conform to local valve discharge to nearest floor drain or codes. Minimum clearances: Front – 6 inches downward, away from any potential hazard to to door or 3 feet to wall;...
  • Page 3 START UP 1. Place disconnect switch and control circuit energize the boiler unless circulator pump is switch in the OFF position. Fill system with operating. water to pre-determined cold fill pressure (one pound of pressure is required for every 2.31 4.
  • Page 4 CONTROLS Controls – All basic controls and terminals are Control Circuit Lighted Switch – De-energizes located in an integral ventilated control cabinet, control circuit (not main power). factory wired and functionally tested. Controls include Class K fuses with 50,000 ampere Operating Controller –...
  • Page 5 5. Excess pressure causing System head pressure exceeds relief valve setting or relief valve to open expansion tank water logged. Lattner Boiler Company 1411 9 St. SW Cedar Rapids, IA 52404 Telephone: (800) 345-1527 Fax: (319) 366-0770...
  • Page 6: Lattner Boiler Limited Warranty

    Lattner neither assumes nor authorizes any person to assume for it any other liability in connection with the sale or use of the boiler or other equipment manufactured by Lattner, and there are no oral agreements or warranties collateral to or affecting this Agreement. LATTNER BOILER COMPANY Cedar Rapids, IA USA 2-98-06...
  • Page 7 Purchaser and the Consent, if given, will be upon the condition the Purchaser assumes all Company and their respective heirs, successors, or assigns. carrier charges, responsibility for damages in transit, and a minimum LATTNER BOILER COMPANY Cedar Rapids, IA USA TC06...

Table of Contents