Test Operation - Daikin BRC7E530W User Manual

Hide thumbs Also See for BRC7E530W:
Table of Contents

Advertisement

OH12-01

6. TEST OPERATION

• Perform test operation according to the instructions in the installation manual attached to the indoor unit.
• After refrigerant piping, drain piping, and electric wiring, operate according to the table to protect the unit.
[PRECAUTIONS]
1. Refer to malfunction code of installation manual attached to the indoor unit, if it does not operate.
2. Refer to the installation manual attached to the outdoor unit for individual operation system types.
Order
(1)
Open gas side stop valve.
(2)
Open liquid side stop valve.
(3)
Electrify for 6 hours.
(4)
Set to cooling with the remote controller and push
(5)
Push
(6)
Push
(7)
Push
(8)
Confirm its function according to the operation manual.
English
Control Systems
button twice and operate in TEST OPERATION mode for 3 minutes.
/TEST
button and confirm its operation.
SWING
button and operate normally.
/TEST
Remote Controller (Wireless Type)
Operation
button to start operation.
ON/OFF
2
8
3P107423-1B
179

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brc7e531w

Table of Contents