Sanyo VW-VF10BG Technical Data & Service Manual page 42

Floor-mounted model with virus washer function
Hide thumbs Also See for VW-VF10BG:
Table of Contents

Advertisement

7
Remove the top joint and left-side joint from the electrolysis tank unit. To remove the joint, press the stopper at
the base of each joint while pulling on it.
8
Remove the electrolysis tank unit together with the installation
bracket (3 screws).
9
Remove the screws (2) from electrolysis tank installation
6
bracket A, then disconnect it from electrolysis tank
installation bracket B. Remove the screw (1) that fastens
the wiring installation band, then pull out the water
temperature sensor. Cut the wire binding band, and
remove the electrolysis unit from electrolysis tank
installation bracket B.
Electrolysis tank
Electrolysis tank
installation bracket B
Binding band
* When replacing the electrolysis tank with a
new one, follow the removal procedure in the
reverse order.
Press
Stopper
Press
Left-side joint
Electrolysis tank
installation bracket B
Electrolysis tank
installation bracket A
Water temperature
sensor
Wiring installation
band
Electrolysis tank
installation bracket B
6 - 6
Maintenance Procedures
Top joint
Screw
Screw
Water temperature sensor
Screw
Stopper
Press
Press
Electrolysis tank
installation bracket
Electrolysis tank
Screws
Electrolysis tank
installation bracket A
Electrolysis tank

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents