1.0 GENERAL RULES
Ensure that the installation of your product conforms to all the indications given below.
Fig. 1
CHIMNEY STACK
CHIMNEY
CONNECTION
TO FLUE
FLUEWAY
SOOT INSPECTION APERTURE
FRESH AIR INTAKE
ELECTRIC
POWER SUPPLY
CAPACITY LOAD
OF THE FLOOR
MINIMUM SAFETY
DISTANCES
1.1 SOOT INSPECTION
We recommend that the flue must have a chamber for collecting solid matter and any condensate located below the connection and which may be
easily inspected by means of an airtight door. (Fig. 1)
4
H07028100/DT2000970 – 01
DT2010216-05
DT2030321-01
DT2010031-01