Procedure (How To Start The Actuator); Checking The Content Of The Package; Mounting The Unit; Initial Setting Of The Connect Controller - SMC Networks LEC-GPR1 Series Operation Manual

Electric actuator controller gateway (gw) unit (profibus type)
Table of Contents

Advertisement

2. 4 Procedure (How to start the actuator)
Install, wire, set and operate the gateway unit referring to the procedure below when the product is
used for the first time.

(1) Checking the content of the package

After unpacking, check the description of the label to identify the gateway unit and the quantity of
accessories.
Part's name
Gateway unit
(LEC-GPR1)
Power supply connector
(*)
These items are included if you ordered by the part number for a set of controller and actuator.

(2) Mounting the unit

Refer to 3.4 How to install for the mounting of the gateway unit.

(3) Initial setting of the connect controller

The parameters of the controller's, that are is connected to the gateway unit need to be set.
Refer to section 4.4 Setting of controller (LEC)

(4) Setting the unit

It is necessary to set the node address and the communication speed by the rotary switch of the
gateway unit. Refer to section 4. Initial Setting

(5) Unit wiring / Connection

Connect cables to the connectors(CN1 to CN3) of the gateway unit.
Refer to section 5. External connection for the wiring of connectors.
Connector
Quantity
1 pc.
1 pc.
- 9 -
Gateway unit
Power supply connector

Advertisement

Table of Contents
loading

Table of Contents