EPOX EP-6VBA2 User Manual page 23

Pentium ii or pentium iii slot1 processor based 4x agp mainboar mainboard (100/66mhz) d (100/66mhz) supports pc-133 sdram module
Hide thumbs Also See for EP-6VBA2:
Table of Contents

Advertisement

EP-6VBA2
Installation
will be shipped with the boxed processor to draw power from a power header on
the mainboard's J4.
Now we are ready to install the SEC Cartridge (Pentium II/III Processor) into the
Retention Module. The SEC Cartridge is mounted by sliding the SEC Cartridge
into the Retention Module and letting it slide all the way down. Once it reaches the
bottom make sure you press firmly on SEC cartridge to firmly secure into the Slot
1 Socket.
Page 3-7

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EP-6VBA2 and is the answer not in the manual?

Questions and answers

Table of Contents