Chimney Connection; Connecting The Burner - DeDietrich GT 210 A Operating Manual

Oil-gas fired hot water boiler
Table of Contents

Advertisement

1 Venting the boiler
The boiler must be connected to a venting system that will safely and effectively discharge all flue gases to the outside in an effective
manner.
Do not Co-Vent a Direct Vent or Sidewall vent system boiler, these venting options are specifically designed for single boiler venting,
follow all local and national codes. The sidewall or direct vent termination must be installed in a location which avoid accumulation of
snow or debris that could block the vent terminal. Consult local codes regarding other requirements for the location and installation of
the vent terminal.
Co-Venting with other appliances, must be sized and installed according to CSA B149 & ANSI Z223.1, Any improper operation of
venting system must be corrected and resized according to the tables in part II of national fuel code Z223.1 & CAN CSA B149
installation codes.
2 Connecting the Venting to the Boiler
Consult local and national codes regarding the sizing of the boiler breeching and chimney venting. See venting section of manual regarding
typical venting systems and requirements.
Important: the position of the head of the burner in relation
to the door insulating material must be as shown opposite,
particularly if the burner is not a De Dietrich burner.
Note:
Refer to the instructions supplied with the burner for information
relating to the connections, adjustment, commissioning and
maintenance of the burner.
(1) See burner instructions as supplied
The fuel tank and supply lines to the burner must be installed
according all applicable National and local codes
12"
26

Chimney connection

Connecting the burner

(1)
3 /8
4
Consult the documentation of the boiler control and the burner documentation as
supplied regarding setup, wiring and startup.
Do not attempt to start the burner, until all service and clean-out doors are closed and
venting is properly connected to the boiler.
Consult the burner documentation regarding the required maintenance required for
the burner, filters and nozzle.
The entire system should be cleaned and check at least once each heating season.
7 /16
4
Ø drilling (3)
1 /4
5
Ø cut-out
4 M8 Ø holes on
15 /16
5
Ø
11 /16
4 markings on 6
GT 210 A
Ø
21/08/06 - 94863106 - 82274096E
3 /16
14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt 214 aGt 215 aGt 216 aGt 217 aGt 218 a

Table of Contents