Lochinvar CHA 100 G CE Installation, Commissioning, User & Maintenance Instructions page 73

Direct gas fired floor standing water heater with automatic pilot ignition
Table of Contents

Advertisement

gis
A
ambient conditions 16
ambient temperature 16
B
burner pressure 29
C
connecting the circulation pipe 23, 24
connecting the cold water side 22, 23
connecting the hot water side 23
control thermostat 45
conversion to a different gas category 33
D
document contents 9
draining 43
E
electrical connection 26
F
filling 41
flame probe 14
G
gas category, conversion to different 33
gas connection 24
general specifications 3
H
humidity 16
I
installation diagram 21
installation engineer 8, 9
isolator 27
J
join
circulation pipe 23, 24
cold water side 22, 23
electrical 26, 27
gas 24
hot water side 23
shuntleiding 22, 23
Instruction manual CHA
Index
L
M
N
O
P
S
T
U
liability 3
mains power 27
maintenance
burner 61
finalizing 62
gas-side 61
orifice 61
performing 59
preparation 59
water-side 59
notation conventions 9
operating cycle 13
packaging 15
protection 13
scale 60
service 8
service engineer 8
shutting down
electrically isolating 51
long period 51
short period 51
specifications 18
supply pressure 29
symbol
installation engineer 8
service engineer 8
user 8
target groups 8
top to bottom circulation pump 22, 23
trademarks 3
user 8
73

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cha 100 ce

Table of Contents