Finalising Maintenance - Lochinvar CHA 100 G CE Installation, Commissioning, User & Maintenance Instructions

Direct gas fired floor standing water heater with automatic pilot ignition
Table of Contents

Advertisement

12
12.4.4
12.5 Finalising
maintenance
62
Performing maintenance
Checking the flue baffles
Warning
The flue baffles may be hot.
1. Carry out steps 1 through 7 of the anode
gas thermostat from the connector on the appliance.")
1. Remove the flue baffles from the appliance.
2. Check the flue baffles for rust, and remove any which is present.
3. Check the flue baffles for wear, and replace any worn flue baffles.
4. Place a new sealing ring on the rim of the tank and re-fit the lid.
5. Insert the plug of the flue gas thermostat into the connector on the appliance.
To finalise the maintenance, carry out the following steps:
1. Fill the appliance
(5
"Filling").
2. Start the appliance up
(9 "Starting the water heater")
(1 "Disconnect the plug of the flue
check.
Instruction manual CHA
s

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cha 100 ce

Table of Contents