Draining Unvented Installations; Draining Vented Installations - Lochinvar CHA 100 G CE Installation, Commissioning, User & Maintenance Instructions

Direct gas fired floor standing water heater with automatic pilot ignition
Table of Contents

Advertisement

6
6.1
Draining unvented
installations
6.2
Draining vented
installations
44
Draining
Some service activities require the water heater to be drained. The procedure
is as follows:
1. Shut down the appliance by setting the ON/OFF switch on the control panel
to position 0.
1
4
RESET
3
2. Isolate the water heater from the power supply by putting the isolator
between the appliance and the mains power supply to position 0.
3. Shut off the gas supply (10).
4. Close the stop valve (11) in the hot water pipe.
5. Close the supply valve of the cold water supply (A).
6. Open the drain valve (9).
7. Bleed the appliance (or installation) so that it drains completely.
Some service activities require the water heater to be drained. The procedure
is as follows:
1. Shut down the appliance by setting the ON/OFF switch on the control panel
to position 0.
4
1
RESET
3
2. Isolate the water heater from the power supply by putting the isolator
between the appliance and the mains power supply to position 0.
3. Shut off the gas supply (10).
4. Close the stop valve (11) in the hot water pipe.
5. Close the stop valve (4) between the cold water head tank and the cold
water inlet.
6. Open the drain valve (9).
7. Bleed the appliance (or installation) so that it drains completely.
gis
2
0063
IMD-0473 R1
2
0063
IMD-0473 R1
Instruction manual CHA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cha 100 ce

Table of Contents