Fully Enclosed
Allow at least
20mm gap for
power and gas
Platform
recommended
Through Wall
This section must be fully
supported from above and
not place any load on the fire
Allow at least
20mm gap for
power and gas
Platform
recommended
295 Min
over
cladding
Rinnai
There must be a clear
path for the flue to pass
There must be a clear
path for the flue to pass
16
Refer to
note on
top fixing
Refer to
note on
top fixing
Y piece flue is
shown, an
alternative is to
run two flues
through to
termination.
Y piece flue is
shown, an
alternative is to
run two flues
through to
termination.
RF1800 OIM