INSTALLATION

The most desirable and beneficial location for a YUNCA LEEDZ (Fuzzy Logic control) heater is
in the centre of a building, thereby allowing the most efficient use of the heat created.
The location of windows, doors and the traffic flow in the room where the heater is to be located,
should all be considered, as should the availability of power supply to the fan boost.
If possible a location should be selected that allows the flue pipe to be installed simply and pass
through the house without cutting a floor or roof joist. Refer to page 5 for typical flue installation
(Fig 2).
To obtain maximum heat distribution with any freestanding heater a ceiling fan may be fitted.
When the appropriate position has been selected the unit must be bolted to the floor to ensure
that the unit remains upright in the event of an earthquake or similar Fig 1 below). If the heater is
being attached to a concrete floor dyna bolts should be used, if the floor is wooden the bolts
used should be long enough to go fully through the floorboards and fixed with nuts and washers
from the underside. The earthquake brackets are located at the back corners of the heater.
The Yunca Leedz does not require a floor protector (hearth), and if desired can be placed
directly on to carpet or wood flooring.
CAUTION: The gas fire must be permanently attached as shown.
Revised 04-08-10
R e c o m m e n d e d S a f e t y F e a t u r e
T h e G a s f ir e s h o u l d b e p e r m a n e n t l y a t t a c h e d a s s h o w n .
F IX IN G B O L T o r S IM IL A R
W A S H E R
E A R T H Q U A K E B R A C K E T
N o t e :
D o n o t u s e E a r t h Q u a k e
h o l e t o P a s s G a s P ip e t h r o u g h .
YUNCA Leedz FS Fuzzy Feb 2010
B A C K C O R N E R O F H E A T E R
Page 4 of 19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents