CLEARANCES and DIMENSIONS
The YUNCA LEEDZ (Fuzzy Logic control) FLUED GAS HEATER should be installed with
clearances equal to or greater than those recommended below (Fig 3) and comply with NZS
5261/ AG601.
This is to ensure adequate air circulation around the heater and avoid heat damage to wall
coverings.
Note: If walled surface is non-combustible (i.e. brick or steel), side clearances may be reduced to
100mm, however note that this may severely restrict access to the appliance for servicing.
Corner positions and back clearance remains the same. (See Fig. 3 Below)