Preoperational Instructions; Shutdown Instructions - Continental Girbau CG75-85 Installation Manual

Gas dsi/electric/steam
Hide thumbs Also See for CG75-85:
Table of Contents

Advertisement

K. PREOPERATIONAL INSTRUCTIONS
OPL MODELS
1. To start the dryer:
a. Microprocessor controller (computer) dryers
1) The light emitting diode (L.E.D.) display will read "FILL."
2) Press the "E" on the keyboard (touch pad).
3) The L.E.D. display will quickly show "Ld30," "LC04," or "F180." The dryer will start, and the
L.E.D. display will show "dr30."
b. Dual timer dryers
1) Turn drying timer knob for a time of 20 minutes.
2) Select "High Temp."
3) Push "Push To Start" switch.
4) To stop dryer, open the main door.
L. SHUTDOWN INSTRUCTIONS
If the dryer is to be shutdown (taken out of service) for a period of time, the following must be performed:
1. Discontinue power to the dryer either at the external disconnect switch or the circuit breaker.
2. Discontinue the gas or steam supply:
a. GAS MODELS...discontinue the gas supply.
1) SHUT OFF external gas supply shutoff valve.
b. STEAM MODELS...discontinue the steam supply.
1) SHUT OFF external (location furnished) shutoff valve.
38

Advertisement

Table of Contents
loading

Table of Contents