Panasonic KX-TD500 Installation Manual page 220

Digital super hybrid system
Hide thumbs Also See for KX-TD500:
Table of Contents

Advertisement

Utility
[Card/Port Test] Port Test – Operation
(Continued from step 5 of [Card/Port Test] – Operation (General).)
a)
Point to
• "Port Test" screen is displayed.
b)
Specify the port number, or select "All."
• If you select "All," all ports on the selected card will be tested at a time.
c)
Click
• After executing the test, the test result is displayed.
Note
• An APT/DPT should be connected to the specified card when executing the DLC or
DHLC port test.
220
in the "Card/Port Test Menu" screen and click.
.
Example: When a DLC card is installed in the Slot No. 101.
Installation Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Td500Kx-td520

Table of Contents