Inspection and Start-up Checklists

Receiving and Inspecting

Unit received undamaged
Unit received complete as ordered including accessories

Handling and Installing

Unit mounted on solid level surface
Sufficient space allowed for access to unit and accessories
Proper electrical service provided
Hot water provided to humidifier
Drain lines and trap installed properly
Ductwork, fittings and grilles installed properly
All cold duct surfaces insulated
Low ambient control included if freezing condition present
No obstructions to air flow to condenser

Starting-up the Unit

General visual inspection looks good
All wiring connections checked
All ducts, grilles and panels in place
Start unit
Check ducts and connections for air leaks
Balance air distribution
Confirm condenser airflow is unrestricted
Verify cooling and heating operation
Check for excessive noise or vibration