POWR
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
ELECTRICAL UNIT REMOVAL
1
Thermo switch coupler
2
Wire harness coupler
3
Electrothermal valve lead
4
Lighting coil lead
5
CDI unit lead coupler
6
Bolt (with washer)
7
Fitting plate ass'y
8
Battery cable
9
Bolt (with washer)
10
PTT switch coupler
11
PTT motor lead
12
Bolt (with washer)
13
Bolt (with washer)
14
Electrical unit
15
Magneto control rod
16
Bolt (with washer)
17
CDI unit
18
Bolt
19
Magneto control lever
20
Spring
21
Accelation cam
Å: Setting length
ELECTRICAL UNIT REMOVAL
Q'ty
Follow the left "Step" for removal.
2
Pink and black leads
1
1
Blue lead
2
Green leads
7
2
1
1
NOTE:
Remove the battery cable at the grommet.
2
1
PTT model
2
Sky blue and light green leads
6 × 30 mm
4
8 × 25 mm
1
1
1
NOTE:
Disconnect the rod from the CDI unit.
2
1
1
1
1
1
Reverse the removal steps for installation.
5-14
Service points
E