Bellfires BCC-28 Tall Installation Manual page 15

Close clearance models
Table of Contents

Advertisement

15-1
15-3
1. Once it is determined the exact place the fireplace will rest, place the supplied
of Cera-foil ceramic fibre blanket on wood floor, foil face up. (15-1) If the BCC is to be installed on a combustible floor
lay the 20 gauge galvanized sheet metal protection (part # 6) on the floor over the ceramic insulation. (15-2) Again, if the
BCC is being installed on a combustible floor and the hearth extension area in front of the fireplace is combustible
extend excess width of the galvanized metal floor protection forward two (2") inches (50mm), creating an ember guard
at front edge of hearth and fireplace facing. (See 16-1 & 16-2 and the discussion on pgs. 16-17.)
2. Position metal fireplace shell(Part 1) in position at intended final location, properly centered over wood floor protec-
tion. At this time double check alignment to insulated flue above, observing a two inch clearance to combustibles. (15-3)
3. Remove
" hex head screws in the top lid and front face panel of metal shell enclosure.(15-4) Shell should now be
open and accessible to install the refractory components. (15-5)
15-4
15
REMOVE TOP LID
REMOVE
FRONT FACE
PANEL
" x 48" (12.5 mm x 122 cm) sheet
Bellfires® BCC
15-2
15-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bcc-21Bcc-19

Table of Contents