Toshiba Carrier RAS-12EKCV-UL Service Manual page 96

Split type
Table of Contents

Advertisement

No.
Part name
Evaporator
(Heat exchanger)
Bearing base
Procedures
7) Unscrew one screw which fix Electrical
Control Box and the casing. Move
Electrical Control Box until can see one
screw that fix Motor band and unscrew
it then remove FIX-EVA-DN
Tighten the screw of Motor band,
assembly Electrical Control Box then
tighten screw to complete reassembly.
1) Follow to the procedure in the item
2) Remove the two screws used to secure
the bearing base.
3) Remove the bearing base.
<Caution at assembling>
• If the bearing is out from the housing,
push it into the specified position and then
incorporate it in the main body.
.
– 96 –
FILE NO. SVM-13071
Remarks
Screw
Motor band
Two screws
Bearing
Bearing base
Screw
Screw

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents