Introduction; Configuration; Chapter 2: Installation; Installation Of The Toughswitch Poe - Ubiquiti TS-5-POE User Manual

Toughswitch table of contents poe power over ethernet managed switches
Hide thumbs Also See for TS-5-POE:
Table of Contents

Advertisement

TOUGHSwitch
PoE User Guide

Chapter 2: Installation

Introduction

Proceed to the instructions for your TOUGHSwitch model:
TOUGHSwitch PoE
The instructions are below.
TOUGHSwitch PoE PRO
TOUGHSwitch PoE PRO" on page 8 for instructions.
TOUGHSwitch PoE CARRIER
the TOUGHSwitch PoE CARRIER" on page 9 for
instructions.

Configuration

After you install the TOUGHSwitch, refer to the
instructions in "Navigation" on page 11, which explain
how to access the Configuration Interface.

Installation of the TOUGHSwitch PoE

Mount the TOUGHSwitch on a wall, or place it on a
bench top.
Note:
Keep 20 mm of clearance next to the
ventilation holes for adequate airflow.
Installation Requirements
• Drill, 6 mm drill bit, and Phillips screwdriver
(wall‑mounting)
• For outdoor applications, shielded Category 5 (or
above) cabling should be used for all wired Ethernet
connections and should be grounded through the AC
ground of the power supply.
• We recommend that you protect your outdoor networks
from the most brutal environments and devastating ESD
attacks with industrial‑grade shielded Ethernet cable
from Ubiquiti Networks. For more details, visit
www.ubnt.com/toughcable
Note:
Although the cabling can be located
outdoors, the TOUGHSwitch itself should be
housed inside a protective enclosure.
Ubiquiti Networks, Inc.
Go to "Installation of the
Go to "Installation of
Wall-Mounting (Optional)
To mount the TOUGHSwitch on a wall:
1. Use a 6 mm drill bit to drill two holes 60 mm apart.
2. Insert the M2.9 Anchors into the holes.
3. Use a Phillips screwdriver to secure a M2.9x20 Screw to
each anchor. Leave a clearance of approximately 3 mm
between each screw head and its anchor.
Note:
You can also mount the TOUGHSwitch in a
horizontal orientation.
4. Position the Wall-Mount Slots of the TOUGHSwitch
over the screw heads on the wall. Then slide the
TOUGHSwitch to the left to lock it into place.
Grounding the TOUGHSwitch (Optional)
The TOUGHSwitch is grounded through the Power
Adapter; however, you can add optional ESD grounding for
enhanced ESD protection.
1. Insert a ground wire (not included) through a corner slot.
2. Twist tie to secure the ground wire to the TOUGHSwitch.
3. Secure the other end of the ground wire to a
grounding block.
Chapter 2: Installation
60 mm
3 mm
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Toughswitch poe ts-5-poeTs-8-proTs-16-carrier

Table of Contents