CONCRETE PAD CONSTRUCTION
Dimensions given for the pad are based on soil bear-
ing shear of 2000 P.S.F. These figures may have to
be adjusted depending on local soil conditions.
1. Construct form for mounting pad according to
dimensions shown in Figure 1, 2 and 3.
2. Locate mounting pad according to dimensions
given in illustration.
3. Level top edge of form.
4. Set reinforcing bars and wire mesh.
5. Mix concrete, pour mixture into form. Level and
finish surface after pouring is complete.
6. Allow pad to cure for 48 hours, and remove forms.
Figure 2
concrete
7 1/4"
18"
OPERATOR
C L
GATE
6"
6

RAM 100 INSTALLATION SPECIFICATIONS

Do not exceed the specifications. The warranty on your unit will be void if the
installation exceeds the recommended specifications.
TOP vIEW
GATE ShOWN CLOSED
Lh
FRONT INSTALLATION
concrete
Mark centers and
18"
install four 1/2-13
UNC Red-head
11 3/4"
Anchor Bolts
BASE
4 1/2"
3" MIN
4"
TAIL
Wall
24"
Figure 1
3" MIN
6"
MIN
5"
24"
Conduit for low
voltage wires
Figure 3
4" MIN
4"
www.ramsetinc.com
GATE
5 3/4"
Conduit for
Master-Slave
18" x 18" x 24"
Conduit for
Concrete Pad
power
ShOWN OPEN
INSTALLATION
GATE
Wall
WALL
4"
6 1/2"
TOP vIEW
GATE
Lh
FRONT

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ram 1000Ram 5500Ram 50 gb

Table of Contents