Lts Series Specifications; Lts Series Packing List - Space-Ray LTU Series Installation And Operation Instructions Manual

Ltu/lts series infrared radiant tube heater
Table of Contents

Advertisement

9.0)

LTS SERIES SPECIFICATIONS

Btu/hr
Btu/hr
Btu/hr
Btu/hr
Model No.
Model No.
Model No.
Model No.
Input
Input
Input
Input
LTS 40
40,000
LTS 50
50,000
LTS 60
60,000
1-7/32"
LTS 75
75,000
1-7/16"
LTS 80
80,000
LTS 90
90,000
LTS 100
100,000
LTS 110
110,000
LTS 120
120,000
LTS 125
125,000
LTS 130
130,000
LTS 140
140,000
2-1/32"
LTS 150
150,000
2-1/32"
LTS 160
160,000
LTS 175
175,000
LTS 180
180,000
LTS 200
200,000
LTS 225
225,000
LTS 250
250,000
* MOUNT HEATERS AS HIGH AS POSSIBLE. Minimums are shown as a guideline for human comfort and uniform
energy distribution for complete building heating applications. Consult your Space-Ray representative for the
particulars of your installation requirements.
Type
Type
Type
Type
Gas Pipe
Gas Pipe
Gas Pipe
Gas Pipe
Gas
Gas
Connection
Connection
Gas
Gas
Connection
Connection
Natural
½" MPT
or Propane
LTS 225 and 250 require a minimum 3/4" nominal ID flexible gas connector.
1
2
LTS 180-250: 6" round. See Section 17.0) for vent sizes and limitations.
In-line: 2 Amp 250V
10.0)

LTS SERIES PACKING LIST

A. A. A. A. Contr
Control/Draft Inducer Package
Contr
Contr
ol/Draft Inducer Package
ol/Draft Inducer Package
ol/Draft Inducer Package
Part Description
Part Description
Part Description
Part Description
Control Box Assembly .............................................................................................................................. 1
Draft Inducer & Junction Box Assembly ................................................................................................ 1
Flue Restrictor Plate (See Section 9.0) for plate I.D. and part no.) ................................................... 1
4" x 6" Starting Collar
Control Fastener Kit (#42907010) ....................................................................................................... 1
Containing: #8-32 Screws & Nuts (#02166010 & #02127030) .......................................... 2
Tube Flange Gasket (#42921000) ...................................................................................................... 2
Installation & Operation Instructions (#43155010) .......................................................................... 1
Gas connector, 5/8" OD x 36" (#30302360)
1
4-inch Starting Collar (#40504020) supplied with LTS 40-175 models.
2
LTS 225 and 250 models using Gas Connector, 1" OD x 36" (#30302361)
Flue Restrictor Plate
Flue Restrictor
Flue Restrictor
Flue Restrictor
Plate
Plate
Plate
I.D. &
I.D. &
I.D. & Part #
I.D. &
Part #
Part #
Part #
1"
#42741040
1-1/8"
#42741030
#42741020
#42741010
1-1/2"
#42741050
1-1/2"
#42741050
1-5/8"
#42741060
1-3/4"
#42741070
1-3/4"
#42741070
1-7/8"
#42741080
1-7/8"
#42741080
#42741090
#42741090
2-1/4"
#42741100
2-1/4"
#42741100
2-1/4"
#42741100
2-3/8"
#42741130
2-1/2"
#42741140
2-3/4"
#42741150
Tube
Tube
Tube
Tube
Diameter
Diameter
1 1 1 1
Diameter
Diameter
(Male)
4"
Fuse
Fuse
Fuse
Fuse Rating:
Rating:
Rating:
Rating:
(for 24V Circuit)
1
(#42892009) Supplied with LTS 180-250 ................................................. 1
¼ - 20 Locknuts (#02167010) .............................................................................. 6
Orifice Size
Orifice Size
Orifice Size
Orifice Size
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Propane Gas
Propane Gas
Propane Gas
Propane Gas
#31
(0.120)
#49
3.3mm
(0.130)
#46
#27
(0.144)
#43
#20
(0.161)
#39
#19
(0.166)
#38
#16
(0.177)
#36
#14
(0.182)
#33
#10
(0.194)
#31
13/64
(0.203)
1/8
#5
(0.206)
#30
#4
(0.209)
3.3mm
5.5mm
(0.216)
#29
5.7mm
(0.224)
#28
5.8mm
(0.228)
#27
"C"
(0.242)
3.8mm
"C"
(0.242)
#24
"F"
(0.257)
#21
6.9mm
(0.272)
#18
"K"
(0.281)
4.5mm
Flue
Flue
Flue
Flue
Fresh Air
Fresh Air
Fresh Air
Fresh Air
Connection
Connection
Connection
Connection
Connection
Connection
2 2 2 2
Connection
Connection
4" Round
6" Round
Ignition System (direct spark):
Ignition System (direct spark):
Ignition System (direct spark):
Ignition System (direct spark):
30 second pre-purge period
................................................................................... 1
2
-16-
Minimum *
Minimum *
Minimum *
Minimum *
Mounting Height
Mounting Height
Mounting Height
Mounting Height
@ @ @ @
Horizontal
Horizontal
Horizontal
Horizontal
(0.073)
10 ft.
(0.081)
11 ft.
(0.089)
12 ft.
(0.099)
13 ft.
(0.102)
13 ft.
(0.106)
13 ft.
(0.113)
13 ft.
(0.120)
14 ft.
(0.125)
14 ft.
(0.129)
14 ft.
(0.130)
14 ft.
(0.136)
15 ft.
(0.140)
15 ft.
(0.144)
15 ft.
(0.150)
15 ft.
(0.152)
18 ft.
(0.159)
18 ft.
(0.170)
20 ft.
(0.177)
20 ft.
Electrical
Electrical
Electrical
Electrical
Current
Current
Current
Current
Supply
Supply
Rating
Rating
Supply
Supply
Rating
Rating
120 Volt, 60Hz,
1 Phase
2.6 Amp
QTY
QTY
QTY
QTY
Form #43155010
Sept 2011
@ @ @ @
45º Angle
45º Angle
45º Angle
45º Angle
9 ft.
10 ft.
11 ft.
12 ft.
12 ft.
12 ft.
12 ft.
13 ft.
13 ft.
13 ft.
13 ft.
14 ft.
14 ft.
14 ft.
14 ft.
17 ft.
17 ft.
19 ft.
19 ft.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents