7.3. Where to use
The grinder should be installed on a flat, stable surface. The minimum
dimensions of the work space should be as follows:
Height
Width
Depth
7.4. Grinder installation
Before grinder installation, the following should be considered:
• The grinder information plaque data coincides with the electrical system on
site.
• The electrical outlet coincides with the grinder plug.
• The electric power at the location of installation should meet the minimum
required to properly run the grinder.
• The installation site should have the proper electrical overload protections.
• The grinder should be properly grounded as specified by local code.
NOTE: The grinder should be used in environments with mínimum temperature
of 77-86F and should not be installed in places (such as industrial kitchens) where
cleaning is done with direct water spray cleaning.
K06315 | v. 14/04/2014 | Ref. quality process 002/03 | ORIGINAL INSTRUCTIONS
F10 MASTER CONIC OD
29.53
750
9.05
230
16.75
420
Model
F10 FRESH, F8 OD
26
670
9.05
230
16.75
420
in
mm
in
mm
in
mm
9
Need help?
Do you have a question about the F10 Master Conic OD and is the answer not in the manual?
Questions and answers