wsm 05-E2B SERIES Workshop Manual page 83

Table of Contents

Advertisement

05-E2B, 05-E2BG, WSM
Nozzle Heat Seal Service Removal Procedure
IMPORTANT
• Use a plus (phillips head) screw driver (1) that has a
diameter which is bigger than the heat seal hole (Approx. 6
mm (1/4 in.)).
1. Drive screw driver (1) lightly into the heat seal hole.
2. Turn screw driver three or four times each way.
3. While turning the screw driver, slowly pull the heat seal (4) out
together with the injection nozzle gasket (3).
4. If the heat seal drops, repeat the above procedure.
(When reassembling)
• Heat seal and injection nozzle gasket must be changed when the
injection nozzle is removed for cleaning or for service.
(1) Plus Screw Driver
(2) Nozzle Holder
Rocker Arm and Push Rod
1. Remove the rocker arm bracket screws.
2. Detach the rocker arm assembly (1).
3. Remove the push rods (2).
(When reassembling)
• When putting the push rods (2) onto the tappets (3), check to see
if their ends are properly engaged with the dimples.
IMPORTANT
• After installing the rocker arm, be sure to adjust the valve
clearance.
Tightening torque
Rocker arm bracket screw
(1) Rocker Arm Assembly
(2) Push Rod
S-29
DIESEL ENGINE
(3) Injection Nozzle Gasket
(4) Heat Seal
W1021255
21.6 to 26.5 N·m
2.2 to 2.7 kgf·m
15.9 to 19.5 ft-lbs
(3) Tappet
W1021437
KiSC issued 06, 2011 A

Advertisement

Table of Contents
loading

This manual is also suitable for:

05-e2bg series

Table of Contents