wsm 05-E2B SERIES Workshop Manual page 104

Table of Contents

Advertisement

05-E2B, 05-E2BG, WSM
Push Rod Alignment
1. Place the push rod on V blocks.
2. Measure the push rod alignment.
3. If the measurement exceeds the allowable limit, replace the push
rod.
Push rod alignment
Allowable limit
Oil Clearance between Tappet and Tappet Guide Bore
1. Measure the tappet O.D. with an outside micrometer.
2. Measure the I.D. of the tappet guide bore with a cylinder gauge,
and calculate the oil clearance.
3. If the oil clearance exceeds the allowable limit or the tappet is
damaged, replace the tappet.
Factory spec.
Oil Clearance between
tappet and tappet guide
bore
Allowable limit
Tappet O.D.
Factory spec.
Tappet guide bore I.D.
Factory spec.
S-50
DIESEL ENGINE
0.25 mm
0.0098 in.
W10292900
0.020 to 0.062 mm
0.0008 to 0.0024 in.
0.07 mm
0.0028 in.
19.959 to 19.980 mm
0.7858 to 0.7866 in.
20.000 to 20.021 mm
0.7874 to 0.7882 in.
KiSC issued 06, 2011 A

Advertisement

Table of Contents
loading

This manual is also suitable for:

05-e2bg series

Table of Contents