EMC VNX5300 Block Installation Manual page 31

Hide thumbs Also See for VNX5300 Block:
Table of Contents

Advertisement

For steps 2 through 5, connect the following cables by matching the double diamonds
the DPE and double circles
on the cable connectors as shown in
place.
2. Connect SP A SAS 1 (
3. Connect SP B SAS 1 (
4. Connect SP A SAS 0 (
5. Connect SP B SAS 0 (
B
LCC B
B
A
LCC B
B
B
SP B SAS 1
8Gb
6Gb
fibre
SAS
2
3
4
5
Switch
Power
Power
Figure 20 Cabling the first two DAEs to the storage processors
on the DAEs with the single diamonds
Figure 19 on page
) to DAE 1 LCC A (
) to DAE 1 LCC B (
) to DAE 2 LCC A (
) to DAE 2 LCC B (
A
#
LCC A
# #
LCC A
D
SP B SAS 0
1 X4
2
3
4
6Gb SAS
0 X4
Switch
Power
30. Ensure that the cables lock into
).
A
).
B
).
C
).
D
C
A
A
S
SPA SAS 1
P A
SAS 1
8Gb
6Gb
fibre
SAS
1
X4
5
SPA SAS 0
6Gb SAS
0 X4
Power
VNX-000775
on
and single circles
Assembling DAEs
31

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VNX5300 Block and is the answer not in the manual?

Questions and answers

Table of Contents