Wiring Diagram - Daikin FUQ71CVEB Installation Manual

Split system air conditioners 4-way blow ceiling suspended type
Hide thumbs Also See for FUQ71CVEB:
Table of Contents

Advertisement

CAUTION
After test operation is completed, check the items mentioned in the clause 2 "2. Items to be checked at
delivery" on page 4.
If the interior finish work is not completed when the test operation is finished, for protection of the air con-
ditioner, ask the customer not operate the air conditioner until the interior finish work is completed.
If the air conditioner is operated, the inside of the indoor units may be polluted by substances generated
from the coating and adhesives used for the interior finish work and cause water splash and leakage.
To the operator carrying out test operation
After test operation is completed, before delivering the air conditioner to the customer, confirm that the
control box lid is closed.
In addition, explain the power supply status (power supply ON/OFF) to the customer.

12. WIRING DIAGRAM

(Refer to Fig. 51)
IN CASE OF SIMULTANEOUS OPERA-
1
TION SYSTEM (NOTE 5)
3
INDOOR UNIT (SLAVE)
5
CONTROL BOX
7
(NOTE 8)
WIRELESS REMOTE CONTROLLER
9
(RECEIVER/DISPLAY UNIT)
(OPTIONAL ACCESSORY)
WIRED REMOTE CONTROLLER
11
(OPTIONAL ACCESSORY) (NOTE 6)
English
2
INDOOR UNIT (MASTER)
4
REMOTE CONTROLLER
6
TO OUTDOOR UNIT (NOTE 3)
8
INDOOR UNIT
CENTRAL REMOTE CONTROLLER
10
(NOTE 4)
12
TO OUTDOOR UNIT
38

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FUQ71CVEB and is the answer not in the manual?

This manual is also suitable for:

Fuq100cvebFuq125cveb

Table of Contents