Maintenance Instructions; If The Valve Does Not Open; If The Valve Does Not Close; Disassembling The Valve - Wascom EMERALD W75ES Operating & Maintenance Manual

Emerald series
Table of Contents

Advertisement

Maintenance instructions

Lime scale can block the hole in the valve diaph-
ragm and interfere with the function of the valve.
It is therefore advisable to disassemble and clean
Fig.
the valve at certain regular intervals. The fre-
74
quency depends on operating conditions and the
level of contamination in the water.
Trouble shooting

If the valve does not open

• Check that power is supplied to the coil.
• Check the coil with an instrument to determine
whether there is a break or a short circuit.
• Disassemble the valve (see below) and check
the openings in the valve diaphragm.
• Check the inlet strainer and clean as required.
• Undo the coil and clean the surfaces of the
magnetic core.

If the valve does not close

• Check that the coil is not live. The valve is
normally closed when the magnet is not
energised.
• Check the return spring.
• Check the diaphragm (pilot pressure opening).

Disassembling the valve

• Pull the coil straight upwards. Use a screwdri-
Fig.
ver if necessary to carefully undo the coil.
75
• Use the tool supplied with the machine
Fig.
(attached to one of the hoses when the
76
machine is delivered) to open the valve
housing. Slide the tool over the protruding
plastic sleeve to that the pegs on the tool
engage the corresponding sockets in the
valve housing.
• Use a wrench or a pair of pliers and unscrew
the upper part of the valve housing.
Mechanical and electrical design
74
ventilating hole
pilot valve
75
76
51
1186
1187
1181

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Emerald w185esEmerald w105esEmerald w125es

Table of Contents