Upgrading to a quad-socket server blade
Figure 29: Guide element for HT-link elements and side-band elements and countersunk
screws.
Three plastic guide elements ensure the exact positioning of the HT-link
elements and side-band elements during installation. These guide elements are
fastened to the housing cover of the master module, see also
housing cover of the master module" on page
Figure 30: Shoulder screws for fastening the slave module
The slave module is fastened to the housing cover of the master module with 5
shoulder screws, see also
9.2
Assembly instructions
The following section describes the steps you need to perform to upgrade the
server blade to a quad-socket server blade. The links take you to the sections
with the descriptions of the individual steps.
–
Removing the handles of the slave module
–
Removing the control panel board of the slave module
–
Preparing the housing cover of the master module
–
Fastening the housing cover of the master module to the slave module
–
Closing the master module
–
Inserting the HT-link elements and the side-band element
BX630 S2
page
51.
Options Guide
Assembly instructions
"Preparing the
50.
47