System Start Up Procedure For The 1770 M10 System - Allen-Bradley 1770-M10 Assembly And Installation Manual

Mass storage systems
Table of Contents

Advertisement

System Start up Procedure for
the 1770 M10 System
14. Insert a 220V AC power cord into J19.
E
Power cord location
If you are unfamiliar with micro-floppies, read appendix A before proceeding.
After you've connected your mass storage system, you've ready to begin
operations. make sure the POWER switch is at position 0. Perform the
following steps for your 1770-M10 system (Figure 1.16):
Figure 1.16

System Start up Procedure for the 1770 M10 System

1770-M10 Mass Storage System - Back View
Insert power cord
Select position 1
1.
Insert the connector end of the power cord into J19.
2.
Insert the plug into the power outlet.
Chapter 4
System Start-Up
FUSE
PULL
MASS STORAGE SYSTEM
M10
Indicator lights green
11972
4 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

1770-m111770-m12

Table of Contents