Unpacking The Cables - Precor P10 Operating And Maintaining

Precor p10 console operating and maintaining
Hide thumbs Also See for P10:
Table of Contents

Advertisement

22
Corner cover (2)
Access cover (2)
Note: Retrieve the cables and other hardware shipped with
the console before you begin installation.

Unpacking the Cables

To connect the console to the base unit, you may need up to
four cables, as follows:
The first three of these cables are shipped with the console or
PVS. The base unit data cable is shipped inside the treadmill
fairing.
Note: The PVS does not include an Ethernet cable.
To unpack the cables:
1.
2. Remove any tapes that secure the cables, then unwind
Assembling and Maintaining TRM 800-Series Treadmills
Ethernet (P80 only)
Television (P80 or PVS)
Power (P80 or PVS)
Base unit data
Open the box containing the P80 console or PVS. Retrieve
the Ethernet, television, and power cables.
them and remove any kinks. Gather the cables into a
bundle (referred to later in this manual as the console
cable assembly).

Advertisement

Table of Contents
loading

Table of Contents