Mazda RX-8 2004 Service Highlights page 350

Mazda rx-8 2004
Hide thumbs Also See for RX-8 2004:
Table of Contents

Advertisement

06-13
ELECTRIC POWER STEERING (EPS)
OUTLINE . . . . . . . . . . . . . . . . . . . . . . . . 06-13-1
STRUCTURAL VIEW . . . . . . . . . . . . . . 06-13-2
SYSTEM WIRING DIAGRAM . . . . . . . . 06-13-3
CONSTRUCTION/OPERATION . . . . . . 06-13-4
Construction. . . . . . . . . . . . . . . . . . . . . 06-13-4
Operation . . . . . . . . . . . . . . . . . . . . . . . 06-13-4
Function of Component Parts . . . . . . . 06-13-5
CONSTRUCTION . . . . . . . . . . . . . . . . . 06-13-5
OPERATION . . . . . . . . . . . . . . . . . . . . . 06-13-6
Construction. . . . . . . . . . . . . . . . . . . . . 06-13-6
Operation . . . . . . . . . . . . . . . . . . . . . . . 06-13-6
End of Toc
ELECTRIC POWER STEERING (EPS) OUTLINE
• Rack assist EPS (Electric Power Steering), with a direct-assist type rack, has been adopted for the steering
rack on all models.
• EPS provides excellent steering feel and smooth handling from low to high speeds due to an electronic control
system.
• Since the electric power assist system does not require a power steering oil pump, engine load has been
reduced and fuel economy improved.
Caution
• After performing the following work on the steering system, always set the EPS system to the
neutral position to prevent system malfunction. Refer to the Workshop Manual for neutral position
setting procedures.
- Replacing the steering gear and linkage
- Replacing the EPS control module
- Disconnecting the steering shaft joint (gear side)
End Of Sie
ELECTRIC POWER STEERING (EPS)
CONSTRUCTION/OPERATION . . . . . . . 06-13-7
Construction . . . . . . . . . . . . . . . . . . . . . 06-13-7
Operation . . . . . . . . . . . . . . . . . . . . . . . 06-13-7
CONSTRUCTION/OPERATION . . . . . . . 06-13-8
Construction . . . . . . . . . . . . . . . . . . . . . 06-13-8
Operation . . . . . . . . . . . . . . . . . . . . . . . 06-13-9
CONTROLLER AREA NETWORK
(CAN) OUTLINE . . . . . . . . . . . . . . . . . . . 06-13-10
CONSTRUCTION/OPERATION . . . . . . . 06-13-11
Construction . . . . . . . . . . . . . . . . . . . . . 06-13-11
Operation . . . . . . . . . . . . . . . . . . . . . . . 06-13-11
06-13
CHU061301034S01
06-13-1

Advertisement

Table of Contents
loading

Table of Contents