Configuring The Installation - Fujitsu 112 Installation And Operating Manual

Heat pump air/water split single service 3 phase
Hide thumbs Also See for 112:
Table of Contents

Advertisement

Heat pump split single service 3 phase

4 Configuring the installation

" Optional DHW kit
DHW tank control (with electrical back-up) requires the
use of the DHW kit.
Warning : The tank must be fitted with an electric
back-up, particularly for anti-legionella cycles.
Please refer to section (Operating principle,
" Optional 2nd circuit kit
The control of 2 heating circuits requires the installation
of the 2
circuit.
nd
If the installation consists of radiators (or fan-convectors)
and a heated floor, zone 2 will correspond to the radiator
(or fan-convectors) zone and zone 1 to the heated
floor zone
Configuration
Type of installation
(Parameter 5700)
Pre-setting 1
1 heating circuit.
Pre-setting 2
1 heating circuit and DHW tank.
Pre-setting 3
2 heating circuits.
Pre-setting 4
2 heating circuits and DHW tank.
Pre-setting 5
Boiler connection and 1 heating circuit.
Pre-setting 6
Boiler connection and 2 heating circuits.
Pre-setting 7
Boiler connection, 1 heating circuit and DHW tank.
Pre-setting 8
Boiler connection, 2 heating circuits and DHW tank.
Pre-setting 9
Pre-setting 10
Do not use for heat pump single service Reserved only for heat pump 2 services
Pre-setting 11
Pre-setting 12
" Please consult us regarding any other installation configuration
- 44 -
" Optional boiler connection kit
The connection of an oil or gas boiler to the heat pump
requires the installation of the boiler connection kit.
" Swimming pool kit option
page
11)
Please refer to the instructions supplied with the
swimming pool kit.
Please refer to the
instructions supplied with
the boiler connection kit.
Installation and operating manual "1364 - EN"
Page
45
46
47
48

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

140160

Table of Contents