Photovoltaic installation system for flat roofs (22 pages)
Summary of Contents for STIEBEL ELTRON Hydro Shark SH-07 KW
Page 1
Hydro Shark Electric Boiler features advanced SH-07 KW technology, impressive energy-saving performance, SH-10 KW and a compact design. Exclusively manufactured by Stiebel Eltron, a leader in heating technologies for the SH-12 KW past 80 years. SH-14 KW SH-19 KW Featuring SH-24 KW •...
Installation Manual CONGRATULATIONS Congratulations and thank you for choosing our micro boiler. Before use, we recommend that you read through this installation manual carefully. Keep this manual for future reference. If you need an additional manual, contact the manufacturer or your local distributor.
INTRODUCTION IMPORTANT! Read this entire manual. Failure to follow all the guides, instructions and rules could cause personal injury or property damage. Improper installation, adjustment, alteration, service and use of this unit can result in serious injury. This unit must be installed by a licensed electrician and plumber. The installation must comply with all national, state and local plumbing and electric codes.
MOUNTING THE UNIT UNIT MUST BE INSTALLED IN A VERTICAL POSITION WITH THE WA- TER FITTINGS POINTING DOWNWARD. DO NOT INSTALL UNIT WHERE IT WOULD ROUTINELY BE SPLASHED WITH WATER OR ELECTRICAL SHOCK MAY RESULT. 1. Leave a minimum of 5” clearance on all sides for servicing. 2.
INSTALLATION ELECTRICAL CONNECTIONS WARNING: BEFORE BEGINNING ANY WORK ON THE ELECTRIC INSTAL- LATION, BE SURE THAT THE MAIN BREAKER PANEL SWITCHES ARE “OFF” TO AVOID ANY DANGER OF ELECTRIC SHOCK. ALL MOUNTING AND PLUMBING MUST BE COMPLETED BEFORE PROCEEDING WITH ELECTRICAL HOOK-UP.
FLUID CONNECTIONS NOTE: EXCESSIVE HEAT FROM SOLDERING COPPER PIPES NEAR THE BOILER MAY CAUSE DAMAGE. 1. All plumbing work must comply with the national, state, local & any other applicable codes. 2. Make sure the radiant floor system has been purged & is free of floating debris. 3.
APPLICATIONS Space Heating Applications • In order to purge air in water pipes within a closed loop system, an air vent, air separator, and expansion tank should be installed in the system. (Hydro Smart pre-built space heating panels incorporate all of these features). •...
Page 13
Dual-purpose hot water heating (Domestic and Space Heating) Insert a Hydro Smart Combi Panel to provide potable heated water and Hydronic Heating (with space heating panel(s)) with one heat source. The Hydro Smart Combi Panel integrates with a wide variety of boilers and delivers “Priority” potable heated water with no storage tank and hydronic space heating in a small reliable package.
Owner’s Guide CONGRATULATIONS Congratulations and thank you for choosing our micro boiler. Before use, we recommend that you read through this owner’s guide carefully. Keep this manual for future reference. If you need an additional manual, contact the manufacturer or your local distributor.
TROUBLESHOOTING General Symptom Possible Cause Solution No Hot Water •No Power •Utility Controlling Load •Safety Thermal Cut Off Tripped •Reset Thermal Cut Off •Not Enough Flow Rate To Activate •Wrong Size Pump •Plugged Flow Sensor •Activate Thermostat/ Clean Flow Sensor Water Not Hot Enough •Water Flow Too High •Reduce Water Flow Rate...
Boiler Pressure Drops Table (Boilers SH-12 thru SH-36) This table is used for sizing Primary (Boiler) Circulator All boilers must use Primary/Secondary circuitry. This is used to create Hydraulic seperation between the Boiler and Emitter circulators allowing you to create 57.5 SH-29,36 34.5...
Need help?
Do you have a question about the Hydro Shark SH-07 KW and is the answer not in the manual?
Questions and answers