Outer Tub/Spinner Removal - Maytag MAH6700AW Series Service

27” front load washer
Table of Contents

Advertisement

Disassembly Procedures
!
Outer Tub and Spinner Removal
1. Disconnect power supply to unit.
2. Remove Top Cover (See "Top Cover Removal").
3. Remove Console (See "Console Removal").
4. Remove Front Panel (See "Front Panel Removal").
5. Remove Motor (See "Motor Removal").
6. Remove Pump Hose (See "Drain Pump Removal").
7. Remove the Drain Hose (See "Drain Pump Removal").
8. Remove the two 13mm bolts securing the Rear Struts
to the base.
9. Rotate the struts up against the bottom of the tub to
ease removal of the tub assembly.
NOTE: The rear struts can be identified by the green
sleeve.
34
WARNING
To avoid risk of electrical shock, personal injury or death;
disconnect power to unit before servicing.
10. Remove two each side 13mm bolts securing Counter
Weights.
NOTE: Torque bolts to 11-22 ft lbs. during installation.
11. Remove wire harness connectors for the heater,
Themistor and ground.
12. Remove two 13mm bolts securing the Front Struts to
base and rotate up against the bottom of the tub.
13. Insert a board or boards across the bottom of the
washer frame to use as a support when removing the
tub assembly.
1x12 - 32" long
16026186
©2006 Maytag Services

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents