Figure 4-14. Interface Conduit Landing And Wiring Channel; Figure 4-15. Interface Wiring Access - Eaton 9E Generation 3 Installation And Operation Manual

20–30 kva (208/220v)
Hide thumbs Also See for 9E Generation 3:
Table of Contents

Advertisement

UPS System Installation

Figure 4-14. Interface Conduit Landing and Wiring Channel

Figure 4-15. Interface Wiring Access

4-16
Eaton 9E UPS (20–30 kVA, 208/220V) Generation 3 Installation and Operation Manual P-164000301—Rev 1
Wiring Access
Interface Wiring Channel
Zip Tie Mounting Clips
(4 places)
Interface conduit landing area
Power Terminal Cover Base
Wiring Access
www.eaton.com/powerquality

Advertisement

Table of Contents
loading

This manual is also suitable for:

9e g3

Table of Contents