GE Security CyberDome II Installation Manual page 31

Advanced pan/tilt/zoom (ptz) cameras
Hide thumbs Also See for CyberDome II:
Table of Contents

Advertisement

Chapter 3
23
Wiring
3. Connect the facility power cable (Figure 21). Use the provided 2-pin power terminal strip. If you are
using a heavier gauge cable, ensure that it is properly seated in the connector.
Figure 21. Power connection
When power is received by the housing board through the power connection, the housing board's
diagnostic power LED will appear orange.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CyberDome II and is the answer not in the manual?

This manual is also suitable for:

Cyberdome ii series

Table of Contents