Thermal Sensor Replacement - Henny Penny SCR-6 Technical Manual

Hide thumbs Also See for SCR-6:
Table of Contents

Advertisement

2-5. THERMAL SENSOR
REPLACEMENT
Step 2
Step 3
Step 6
203
1.
Remove electrical power to unit.
To avoid electrical shock or property damage, move the
power switch to OFF and disconnect main circuit
breaker, or unplug cord at wall receptacle.
2.
Remove the side panel closest to the controls.
3.
Unplug probe from control PC board.
4.
Press down on the probe bracket and pull probe from
bracket, or using 3/8" socket, remove nut securing probe
bracket to unit and remove bracket and probe from unit.
5.
Remove vent panels from inside unit. (See Cleaning
Section of Operator's Manual.)
6.
Install new probe in reverse manner , exposing the probe
1½" (38 mm) inside cabinet.
1½ inch (38 mm) probe position is important. Improper
positioning causes erroneous temperature readings.
7.
Plug probe onto P2, a 2 pin connector .
SCR-6/8
2-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scr-8

Table of Contents