Changing Cpu Clock Settings; Time Required For Cpu Clock Switchover; Maximum Time Required For Cpu Clock Switchover - NEC PD78081(A) User Manual

8-bit single-chip microcontroller
Table of Contents

Advertisement

5.6 Changing CPU Clock Settings

5.6.1 Time required for CPU clock switchover

The CPU clock can be switched over by means of bits 0 to 2 (PCC0 to PCC2) of the processor clock control register
(PCC).
The actual switchover operation is not performed directly after writing to the PCC, but operation continues on the
pre-switchover clock for several instructions (see Table 5-2).
Set Values before
Switchover
PCC2
PCC2 PCC1
PCC0
0
0
0
0
0
1
0
1
0
0
1
1
1
0
0
Remark One instruction is the minimum instruction execution time with the pre-switchover CPU clock.
CHAPTER 5 CLOCK GENERATOR
Table 5-2. Maximum Time Required for CPU Clock Switchover
PCC1
PCC0
PCC2
PCC1
0
0
0
0
16 instructions
8 instructions
4 instructions
4 instructions
2 instructions
2 instructions
1 instruction
1 instruction
Set Values After Switchover
PCC0
PCC2
PCC1
PCC0
0
1
0
1
16 instructions
8 instructions
2 instructions
1 instruction
PCC2
PCC1
PCC0
PCC2
0
0
1
1
16 instructions
8 instructions
4 instructions
1 instruction
PCC1
PCC0
1
0
0
16 instructions
8 instructions
4 instructions
2 instructions
77

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents