GE ZBD5900 Technical Service Manual page 20

Hide thumbs Also See for ZBD5900:
Table of Contents

Advertisement

The following points are listed in relation to the pres-
sure switch function and operation.
• The pressure switch has no control on the water level in
the tub. The water level is time fill controlled.
• Contacts 1 to 2 provide a signal to the controller to
terminate the drain mode after pump out.
• In the satisfied position, contacts 1 to 3 are open. No wire
is connected to terminal 3 of the pressure switch. The
controller senses the open circuit and advances the
program.
• The actual "head" of water present from the bottom of the
load collector to the "Y" connection of the pressure switch
hoses actuates the pressure switch diaphragm.
results in a satisfied condition (i.e. contacts 1 to 3 reading
an open circuit).
Circuit Diagram: Pressure Switch
Important. Check all wiring connections before reconnecting to supply.
This
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zbd5700Zbd5600Monogram zbd5900Monogram zbd5700Monogram zbd5600

Table of Contents