Download Print this page

Big Backyard ORIANA A24656E Installation And Operating Instructions Manual page 30

For use with selwood 1.2 metre fort – a23835e

Advertisement

Step 16: Wall Assembly cont.
D: In between both (F13) Posts on Wall side attach 8 (F7) Wall Boards to (F14) Wall Support and (F17) End Floor
with 4 (S0) #8 x 7/8" Truss Screws per board. The first should be tight against (F13) Post and the last board tight
to (F5) Cedar Wall on Front Wall. The remaining boards are to be evenly spaced at 5/8", but not to exceed 1" gap.
All boards are to be tight against (F6) Cedar Gap Board and bevelled edges are facing out and are at the top of the
boards. (fig. 16.2)
Fig. 16.2
F13
Start here and keep
board tight to Post
F17
Wood Parts
8 x
Wall Board 1/2 x 4 x 20"
F7
F14
F6
x 8
F7
32 x
S0
Gap 5/8" Not to Exceed 1"
Bevelled edge
faces out
S0
x 4 per board
Hardware
# 8 x 7/8" Truss Screw
30
Tight together
F5

Advertisement

loading

Related Products for Big Backyard ORIANA A24656E