Download Print this page

Big Backyard ORIANA A24656E Installation And Operating Instructions Manual page 23

For use with selwood 1.2 metre fort – a23835e

Advertisement

Step 11: Swing Side Wall Assembly
A: In between both (F13) Posts on Swing Wall side attach 7 (F7) Wall Boards to (F14) Wall Support and (F17)
End Floor with 4 (S0) #8 x 7/8" Truss Screws per board. The first and last board should be tight against each
(F13) Post. The remaining boards are to be evenly spaced at 1-1/2", but not to exceed 1-3/4" gap. All boards are
to be tight against (F6) Cedar Gap Board and bevelled edges are facing out and are at the top of the boards. (fig.
11.1 &11.2)
Wood Parts
7 x
Wall Board 1/2 x 4 x 20"
F7
Fig. 11.1
F13
S0 x 4 per board
Tight to Post
F17
28 x
S0
Fig. 11.2
F14
Hardware
#8 x 7/8" Truss Screw
23
Gap 1-1/2", Not to
Exceed 1-3/4"
F13
Bevelled edge
faces out
F7
Tight to Post
F6

Advertisement

loading

Related Products for Big Backyard ORIANA A24656E