Download Print this page

Big Backyard ORIANA A24656E Installation And Operating Instructions Manual page 16

For use with selwood 1.2 metre fort – a23835e

Advertisement

Step 6: Floor Frame Assembly
If you purchased a Selwood Monkey Ladder or Selwood Spiral Wave Slide
refer to that manual.
A: From inside of assembly, measure 2-1/8" down from the tops of each (F17) End Floor (fig. 6.2 & 6.3) then
attach (OR7) Floor Joist using 2 (S4) #8 x 3" Wood Screws per end. (fig. 6.1)
F17
S4
2-1/8"
S4
2-1/8"
2-1/8"
Wood Parts
1 x
Floor Joist 5/4 x 4 x 46-1/2"
OR7
Fig. 6.1
Fig. 6.2
4 x
F17
OR7
Fig. 6.3
Hardware
#8x 3" Wood Screw
S4
16
S4
2-1/8"
S4
2-1/8"
2-1/8"

Advertisement

loading

Related Products for Big Backyard ORIANA A24656E