Download Print this page

Big Backyard ORIANA A24656E Installation And Operating Instructions Manual page 24

For use with selwood 1.2 metre fort – a23835e

Advertisement

Step 12: Back Frame Assembly
A: Attach (OR3) Back Divider to (OR9) Floor Back with 1 (H1) 1/4 x 1-1/2" Hex Bolt (with lock washer, flat washer
and t-nut) and to (F10) Top Front Back using 1 (PB2) 1/4 x 1-1/4" Pan Bolt (with lock washer, flat washer and t-nut).
Make sure (OR3) Back Divider is flush to the bottom of (OR9) Floor Back. (fig. 12.1) Keep bolts loose.
B: Maintaining a 29" gap between (F10) Top Front Back and (OR9) Floor Back, level (F10) Top Front Back and
then attach to both (F13) Posts using 4 (S7) #12 x 2" Pan Screws (with 3/16" flat washers). (fig. 12.2)
Fig. 12.2
Under deck view
Wood Parts
1 x
Back Divider 1 x 4 x 35-1/4"
OR3
1 x
Top Front Back 1 x 4 x 46-1/2"
F10
Fig. 12.1
F13
F10
S7
F13
29"
OR9
1 x
H1
4 x
S7
1 x
PB2
OR3
H1
Hardware
1/4 x 1-1/2" Hex Bolt
(1/4" lock washer, 1/4" flat washer, 1/4" t-nut)
#12 x 2" Pan Screw
(3/16" flat washer)
1/4 x 1-1/4" Pan Bolt
(1/4" lock washer, 1/4" flat washer , 1/4" t-nut)
24
S7
PB2
Keep Loose for
chalk wall
F13

Advertisement

loading

Related Products for Big Backyard ORIANA A24656E