Download Print this page

Step 4: Front Frame Assembly - Big Backyard ORIANA A24656E Installation And Operating Instructions Manual

For use with selwood 1.2 metre fort – a23835e

Advertisement

Step 4: Front Frame Assembly

Note: Pre-drill all holes using a 1/8" drill
bit before installing the lag screws.
A: Attach (F12) Floor Front to both (F13) Posts using 2 (H6) 1/4 x 4-3/4" Hex Bolts (with lock washer, flat washer
and t-nut). (fig. 4.1)
B: Square and attach 1 (F9) Front Back to the bottom of (F13) Posts with 2 (LS3) 1/4 x 3" Lag Screws (with flat
washer) in the top (pre-drilled) hole and 2 (S7) #12 x 2" Pan Screws (with 3/16" flat washer) in the bottom holes
as shown in (fig. 4.1).
C: Tighten all bolts.
H6
F13
S7
LS3
Wood Parts
1 x
Front Back 1 x 5 x 46-5/8"
F9
1 x
Floor Front 2 x 3 x 46-1/4"
F12
Predrill Pilot Holes for Lag Screw
Lag
Screw
Flat
Washer
F12
Notice hole
location towards
bottom
F13
F9
Note: Some
boards removed
for clarity
Hardware
2 x
1/4 x 4-3/4" Hex Bolt
H6
(1/4" lock washer, 1/4" flat washer, 1/4" t-nut)
LS3
2 x
1/4 x 3" Lag Screw
(1/4" flat washer)
2 x
#12 x 2" Pan Screw (with 3/16" flat washer)
S7
14
Lock
Predrill 1/8"
Washer
pilot hole
Use factory drilled
Flat
hole as a guide
Washer
Fig. 4.1
H6
LS3
S7
Hex Bolt Assembly
T- Nut
He x
Bolt

Advertisement

loading

Related Products for Big Backyard ORIANA A24656E